The entire roof covering was stripped off to reveal the rafters, which were then cleaned and prepared.
New, high-quality breathable membrane and tanalised batten were applied, and new 5U felt was fitted to form a drip into the gutter.
The roof was retiled using smooth, grey, matching concrete tiles.